Monday 12 December 2016

Working with a Scaffold Tower



  • The tower is level and on firm ground.
  • One or some are missing it could weaken your tower dramatically.
  • Check for cables and overhead obstructions when moving.
  • Never exceed the manufacturers limits  particularly in height.
  • Don’t use them in strong winds. 
  • Many towers have out riggers don’t take a risky short cut and use these. 
  • Reduce the height of the tower.


No comments:

Post a Comment